Thursday, December 23, 2010

Section 7- Recce & Location Sheets

RISK ASSESSMENT
Location One


College/Course/Class/Group

As Media, Block E




Project title

Dirty Ego




Scene/Item/Feature

Scene 1




Date of period this risk assessment covers

November-December 2011




Producer

She Rock




Location address & details

Padgate Train Station, Warrington






Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation
HAZARD

HAZARD

HAZARD

Costume/make up

Access

Machinery

Hydraulics

Animals

Mines/excavations/tunnels/quarries

Catering

Audience/Public
Y
Noise
Y
Lighting

Communications

Person with special needs

Scaffolds

Confined spaces
Physical exertion

Smoke effects

Derelict buildings/dangerous structures

Speed

Stunts

Electricity/gas

Vehicles and off road driving
Y
Physical effects

Fire/flammable materials

Violence/public disorder



Fight sequence

Water/Tide



Glass

Weather
Y


Hazardous substances/chemicals

Working at heights



Heat/cold
Other



Inexperienced performer or childrenN.B. For children, a copy of this risk assessment must be provided to parent/guardian






Equipment:
If the day of shooting’s weather is wet, the camera equipment may be effected. The lighting and noise may affect the quality of our film. As it is a public area filming may affect people’s access to some areas of the train station.









Details of Activity:
Filming character on train, and getting off it. Filming various shots of the train moving from different angles and locations.








Hazards Identified and Risks Arising
Wet weather, public being affected in filming process





Risk Assessment and Proposed Precautions
Weather will be checked on morning of shooting, only areas will be cut off the public do not need to access trains.





N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD
I have read the above and am satisfied that:
It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks.
Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc

Signature of Producer: She Rock________________ Date:20.10.10____________
Name of Producer: She Rock


Signature of Tutor:_______________________________Date:__________________

Name of Tutor:



RISK ASSESSMENT

Location 2


College/Course/Class/Group

As Media Block E




Project title

Thriller opening- Dirty Ego




Scene/Item/Feature

Scene 2




Date of period this risk assessment covers

November-December 2011




Producer

She Rock




Location address & details

1 Station Cottage, Station Road, Padgate





Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation
HAZARD

HAZARD

HAZARD

Costume/make up

Access
Y
Machinery

Hydraulics

Animals

Mines/excavations/tunnels/quarries

Catering

Audience/Public

Noise

Lighting

Communications

Person with special needs

Scaffolds

Confined spaces
Y
Physical exertion

Smoke effects

Derelict buildings/dangerous structures

Speed

Stunts

Electricity/gas

Vehicles and off road driving

Physical effects

Fire/flammable materials

Violence/public disorder



Fight sequence

Water/Tide



Glass

Weather



Hazardous substances/chemicals

Working at heights



Heat/cold
Other



Inexperienced performer or childrenN.B. For children, a copy of this risk assessment must be provided to parent/guardian






Equipment: (Please list any equipment that might be affected by the activities you have ticked above).

Small spaces may affect the camera equipment, it may be hard to move around and use a tripod.








Details of Activity:
Filming the notice board, different angles and shots of the board and the person creating it.








Hazards Identified and Risks Arising






Risk Assessment and Proposed Precautions
Actors will approve of room and stairs will have a banister.





N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD
I have read the above and am satisfied that:
It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks.
Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc

Signature of Producer: She Rock________________ Date:20.10.10____________
Name of Producer: She Rock


Signature of Tutor:_______________________________Date:__________________

Name of Tutor:

No comments:

Post a Comment