RISK ASSESSMENT
Location One
College/Course/Class/Group | As Media, Block E |
Project title | Dirty Ego |
Scene/Item/Feature | Scene 1 |
Date of period this risk assessment covers | November-December 2011 |
Producer | She Rock |
Location address & details | Padgate Train Station, Warrington |
Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation | |||||
HAZARD | HAZARD | HAZARD | |||
Costume/make up | Access | Machinery | |||
Hydraulics | Animals | Mines/excavations/tunnels/quarries | |||
Catering | Audience/Public | Y | Noise | Y | |
Lighting | Communications | Person with special needs | |||
Scaffolds | Confined spaces | Physical exertion | |||
Smoke effects | Derelict buildings/dangerous structures | Speed | |||
Stunts | Electricity/gas | Vehicles and off road driving | Y | ||
Physical effects | Fire/flammable materials | Violence/public disorder | |||
Fight sequence | Water/Tide | ||||
Glass | Weather | Y | |||
Hazardous substances/chemicals | Working at heights | ||||
Heat/cold | Other | ||||
Inexperienced performer or childrenN.B. For children, a copy of this risk assessment must be provided to parent/guardian |
Equipment: If the day of shooting’s weather is wet, the camera equipment may be effected. The lighting and noise may affect the quality of our film. As it is a public area filming may affect people’s access to some areas of the train station. |
Details of Activity: Filming character on train, and getting off it. Filming various shots of the train moving from different angles and locations. | |
Hazards Identified and Risks Arising Wet weather, public being affected in filming process | Risk Assessment and Proposed Precautions Weather will be checked on morning of shooting, only areas will be cut off the public do not need to access trains. |
N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD I have read the above and am satisfied that: It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks. Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc |
Signature of Producer: She Rock________________ Date:20.10.10____________ Name of Producer: She Rock |
Signature of Tutor:_______________________________Date:__________________ Name of Tutor: |
RISK ASSESSMENT
College/Course/Class/Group | As Media Block E |
Project title | Thriller opening- Dirty Ego |
Scene/Item/Feature | Scene 2 |
Date of period this risk assessment covers | November-December 2011 |
Producer | She Rock |
Location address & details | 1 Station Cottage, Station Road, Padgate |
Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation | |||||
HAZARD | HAZARD | HAZARD | |||
Costume/make up | Access | Y | Machinery | ||
Hydraulics | Animals | Mines/excavations/tunnels/quarries | |||
Catering | Audience/Public | Noise | |||
Lighting | Communications | Person with special needs | |||
Scaffolds | Confined spaces | Y | Physical exertion | ||
Smoke effects | Derelict buildings/dangerous structures | Speed | |||
Stunts | Electricity/gas | Vehicles and off road driving | |||
Physical effects | Fire/flammable materials | Violence/public disorder | |||
Fight sequence | Water/Tide | ||||
Glass | Weather | ||||
Hazardous substances/chemicals | Working at heights | ||||
Heat/cold | Other | ||||
Inexperienced performer or childrenN.B. For children, a copy of this risk assessment must be provided to parent/guardian |
Equipment: (Please list any equipment that might be affected by the activities you have ticked above). Small spaces may affect the camera equipment, it may be hard to move around and use a tripod. |
Details of Activity: Filming the notice board, different angles and shots of the board and the person creating it. | |
Hazards Identified and Risks Arising | Risk Assessment and Proposed Precautions Actors will approve of room and stairs will have a banister. |
N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD I have read the above and am satisfied that: It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks. Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc |
Signature of Producer: She Rock________________ Date:20.10.10____________ Name of Producer: She Rock |
Signature of Tutor:_______________________________Date:__________________ Name of Tutor: |
No comments:
Post a Comment